array(2) {
[0]=>
string(815) "
select r.*,
rc.info,
t.title as threadtitle,
u.username as username,
u.anonymous as useranonymous,
`f`.`value` AS `flairvalue`,
`ft`.`name` AS `flairname`,
`ft`.`colour` AS `flaircolour`,
`ft`.`icon` AS `flairicon`
from reply as r
join thread as t on t.id = r.threadid
join replycontent as rc on rc.replyid = r.id
join user as u on u.id = r.userid
left join `flair` `f` on `f`.`userid` = `u`.`id` and `f`.`categoryid` = `t`.`categoryid`
left join `flairoption` `ft` on `ft`.`id` = `f`.`flairoptionid`
where r.businessid = :businessId
and r.threadid = :threadId
group by r.id
order by r.utcdated desc
limit 0,50
"
[1]=>
array(2) {
["businessId"]=>
int(1)
["threadId"]=>
int(37581)
}
}

Years ago
local construction pleading for council projects
Government contracts are always over the top, one reason is the hoops contractors need to jump through. The specs supplied are always over the top as well.
I know of one spec where the design company called for stainless steel pull wires in electrical conduits instead of the usual blue and gold rope. Added $250k to the job. On another one, daily testing at a NATA lab was required for the first 6 months, cost would have been $223/day plus labour.

